The below results were taken from October 2024 – February 2025.

*Panels were deployed an average of 66% across the units for the duration.
*Total run time hours of 2,436 which equates to 101 total days usage over the period.

Stats Icon Cloud

Carbon Savings (tons of CO2e)

Stat Icon Pump

Fuel Savings (gallons)

US $ Icon

Cost Savings (USD)

Background

Coinford, a prominent groundworks and RC frame contractor in the South East, required a reliable, sustainable lighting solution to support nighttime operations on their construction sites.

After exploring options, they turned to Prolectric to investigate our ProRXM Solar Tower Lights, a solution that aligns with their commitment to operational efficiency and environmental responsibility.

Coinford Logo Green

Challenge

Coinford needed robust lighting that met specific lux requirements for task visibility and safety during nighttime work. Additionally, they required year-round functionality in a limited space, demanding a footprint smaller than traditional diesel towers. The lights being deployed also had to align with Coinford’s commitment to best practice and sustainability.

The Solution

Prolectric provided Coinford with a trial of our ProRXM Solar Lighting Tower, customizing it along the way to address their unique needs.

Working closely, Coinford and Prolectric developed a series of modifications to the standard setup of the ProRXM Tower Light resulting in the creation of a completely bespoke product for Coinford’s site-specific requirements. The tower’s were modified using our patented adaptive software, tailoring it to provide higher brightness for shorter nighttime operations.

Leveraging ten years of data and built-in adaptive algorithms, the ProRXM adjusts light output based on location, battery levels, and historical data, ensuring maximum efficiency and reliability even in challenging conditions. By switching from diesel to solar powered lighting, Coinford is expected to save over 161 tons of CO₂ per annum on the initial 10 ProRXM units, compared to the most efficient diesel tower light.

Their team received technical training on-site, along with guidance on our Lighting Portal, enabling remote monitoring and management of the lights.

The Result

Switching from diesel lighting to Prolectric’s solar solution delivered substantial benefits:

Cost Savings

Solar lighting eliminated fuel and refueling costs, significantly reducing operational expenses compared to diesel alternatives.

Carbon Reduction

Each ProRXM tower prevents up to 1.5 tons of CO2 emissions monthly, supporting Coinford’s environmental targets.

Health & Safety Improvement

The high-lux, consistent lighting enhances task visibility and site safety, reducing risks associated with nighttime construction.

 

Prolectric’s ProRXM Solar Lighting Towers allowed Coinford to achieve a cost-effective, environmentally responsible lighting solution with performance and branding customizations that set them apart in the marketplace. This partnership exemplifies sustainable innovation for construction lighting needs.

Downloads

Download the Case Study to assist in your business case.

What our clients
have to say

We’re excited to work together
on your next project.

Available for purchase or hire
ProRXM Front Right Deployed [Lights Off]