The Result
I have purchased Prolectric’s solar lighting equipment for use as a contingency when the regular network is offline / isolated for reasons such as cable failures, excavations etc.
There are now Prolectric Tower Lighting Units in use across the site, so we have a high level of confidence in both the Prolectric as a company and the products they produce, as well as the after sales service and support they provide.
The growing number of Prolectric Solar Tower Lighting Units across the business has also had the added benefit of removing a large amount of diesel-powered equivalents from the site allowing greater compliance with Sellafield’s ongoing initiative to improve levels of sustainability for which we have won praise from Senior Management.
In summary, I would have no hesitation in recommending Prolectric to any potential future customers as I have found them to be both amenable and professional to deal with and look forward to doing further business with them in the future.
Richard Thompson, Reliability Engineer – Infrastructure Utilities, Sellafield Ltd
Furthermore, it was noted that the Prolectric operations team dealt with site requirements promptly and were quick to assist with any site needs 24/7. Simultaneously, the sales team continue to be on hand to provide support, further assisting in site operational requirements and improvement of equipment, moving from diesel to solar.
The below results were taken from 1 January – 26 June 2024, showing the significant savings made by Sellafield in this year alone – across the long lifespan of their fleet of tower lights.