Challenge
Noise and air pollution affects the quality of life for residents along the A487 with the high volumes of traffic. As this was already a major issue, reducing the air pollution and noise made by the construction works would be crucial for the residents in the area.
Jones Bros needed an alternative to traditional diesel fuel generators, which would have only added to the problem. During the construction phase the main compound of temporary site offices had grid power. However, as the new bypass is almost 10km in length there was a requirement to provide welfare facilities for workers along the route.
As there is no access to mains power, normally these compounds would be powered by diesel generators that run 24/7. Balfour Beatty and Jones Bros identified that this wasn’t an efficient use of the generators as they are a major contributor to C02 emissions on site.