Using prolectric’s telematics platform, we’ve cut unnecessary site visits, saved fuel and time, and spotted issues before they impacted operations. It’s a game changer for fleet efficiency and ESG reporting.
Plant Operations Manager, Tier 1 Contractor
Highways England’s environmental strategy seeks to help protect, manage and enhance the quality of the surrounding environment.
The use of Prolectric solar powered lights on the project is an excellent innovative approach by the A14 Integrated delivery team. The use of renewable power sources on the A14 scheme helps us to work in greater harmony with the environment.
David Bray
Project Director, National Highways
After the initial concern of suggesting to run a diesel generator 24/7 for the project duration, Magnox hired the Prolectric ProPower Solar Hybrid Generator. The evident demonstration of the effectiveness of commercially available solar hybrid equipment has been the driving force behind this investigation. This provided a great example of sustainable solutions meeting the needs of projects on site and demonstrates the applicability of using solar hybrid systems.
Jack Armitage
Consultant, Magnox
We frequently need to maintain screens, set up temporary defences, apply temporary structures, or operate gates and sluices in an emergency during darkness. The beauty of the technology is that it is activated only as-needed by PIR sensors and without the fumes or noise from a diesel generator. The ProTemp light is easy to position using a fork lift. We can also transfer it to a permanent post.
Neil Lote
Delivery Lead, Environment Agency
Get all the details you need to evaluate the ProLight. Built to deliver reliable lighting performance in the most demanding environments.
As the off-grid solar lighting and power experts, we offer solutions that are reliable, commercially viable and environmentally responsible.
Call us for an urgent query on 01275 400570,
email us or fill out the short form below.