Background

Milestone Infrastructure are responsible for providing maintenance services for highway infrastructure around Hinkley Point C nuclear power station, the biggest building site for a power station in Europe, based in Somerset.

Hinkley Point C (HPC) will make a major contribution to the UK’s move to reduce carbon emissions and will deliver low-carbon electricity to around 6 million homes.

The station will offset 9 million tonnes of carbon dioxide emissions a year, or 600 million tonnes over its 60-year lifespan.

Milestone Infrastructure

Challenge

Milestone Infrastructure Limited and HPC faced several challenges in the implementation of solar lighting solutions:

  • Demanding environment: at HPC work never stops and a temporary lighting solution was needed to illuminate nighttime working at key points in the site from dusk to dawn.
  • Alternative to diesel lighting towers: traditional diesel-powered lighting towers were seen as an unattractive option, with high noise levels, the substantial cost of diesel fuel, the requirement for refuelling, and periodic maintenance.
  • Required a sustainable solution: In a project looking to provide clean energy, they needed a sustainable lighting solution for nighttime work that delivered low-carbon lighting.

The Solution

Prolectric provided tailored solutions to address HPC’s challenges:

Award-winning solar lighting tower

The ProLight delivers powerful light without noise or emissions and zero-fuel, no-emissions smart solar alternatives to diesel-powered products, accelerating customers away from fossil fuels.

Autonomous lighting

Our intelligent products are designed to interpret advanced telematics, historic weather data and GPS location data. They then autonomously adapt based on their remaining battery power, to ensure optimum performance, meaning the lights work all night.

Comprehensive support

Prolectric offered unparalleled support from point of sale to ongoing product assistance, creating a collaborative and trusting relationship.

Environmental impact

Prolectric’s solar power solutions were acknowledged for their positive impact on reducing carbon footprints across various site locations. This alignment with sustainable practices enhanced the environmental credentials of Milestones operations.

The Result

Throughout the winter EDF and Milestone deployed Prolectric products throughout the site, featuring 58 solar-powered lighting towers. The integration of these solar lighting towers has notably contributed to the reduction of carbon emissions and diesel consumption, leading to substantial cost savings.

Our smart, clean, cost-effective, and user-friendly technology has presented compelling evidence of carbon savings. Collaborations with Tier 1 contractors showcase the considerable potential to make significant contributions towards meeting carbon reduction targets in the construction industry.

Over the last 4 years of this ongoing project they have saved a staggering amount.

Downloads

Download the Case Study to assist in your business case.

What our clients have to say

Hire or Purchase –
Choose what works for your site?

Prolectric ProCharge BESS 3-Phase stowed

Prolectric are fully accredited with the following bodies

Explore Our Range of Products

As the off-grid solar lighting and power experts, we offer solutions that are reliable, commercially viable and environmentally responsible.

Brochure Download
Please provide a business email address or use the live chat to speak to us.

We guarantee response within 24 hours.

Fields marked with an asterisk (*) are required and must be completed. Prolectric is committed to protecting your privacy. By clicking submit, you agree that we may use your personal data to respond to your enquiry, in accordance with our Privacy Policy.

Freya

Can’t find what you’re looking for?

Call us for an urgent query on 01275 400570,
email us or fill out the short form below.

Have You Found Your Solution?
Please provide a business email address or use the live chat to speak to us.

We guarantee response within 24 hours. Fields marked with an asterisk (*) are required and must be completed. Prolectric is committed to protecting your privacy. By clicking submit, you agree that we may use your personal data to respond to your enquiry, in accordance with our Privacy Policy.

Prolectric Services
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.