North Somerset Council underwent extensive car park improvements at its Castlewood headquarters in Clevedon. Part of the contract required the provision and installation of car park lighting to provide a safe and secure environment for the council office workers.
The Castlewood car park installation is the first installation for North Somerset Council and Steve Hodges, M&E and Energy Manager at the council commented, ‘We were first made aware of the technology by Prolectric back in early 2014, which was about the time we were looking at the car parking challenges we had at the site.
After researching the technology in more detail, we decided to install Prolectric’s solar lighting. The installation was completed in early November and I am pleased to say that the technology has performed very well through the harsh winter months’.
Steve also added ‘As well as installation savings our running costs are zero, making it a very cost effective solution from both a capital and revenue perspective’. Prolectric’s Managing Director commented, ‘We are really pleased to support North Somerset in reducing the costs of the installation by some 50% when compared to a conventional mains powered lighting solution.
Significant savings, are made because installing our solar lights reduces the need to excavate many metres of trenches to lay power cables. Prolectric now has thousands of these lights up and down the country, operating in streets, car parks and footpaths.Providing an energy efficient solution at the same time as reducing installation costs considerably’.
Download the Case Study to assist in your business case.
After researching the technology in more detail, we decided to install Prolectric’s solar lighting on our site. The installation was completed in early November and I am pleased to say that the technology has performed very well through the harsh winter months.
Steve HodgesQinetiQ has a target of becoming a Net-Zero company with ambitious near-term GHG emission reduction targets. To assist with this ambition, Prolectric assessed our lighting needs, developed a detailed site lighting plan and installed over 129 solar street lights and bollards at our Headquarters at Cody Technology Park. The new lights are bright and reliable, improving health and safety during the hours of darkness. The lighting is high quality and proving to be robust in harsh weathers. All lighting completed so far, has required minimal maintenance and the installation has been well received by both the company and our tenants alike.
Simon HomerMany months of operation, has resulted in further projects being considered by the council. Our solar lighting trial has been a huge success, feedback from both the householders and our own maintenance team has been really positive.
John HopkinHaving used Prolectric for several lighting projects now, I find their approach, ease of use, knowledge and range of products to be very good. It’s fantastic to be able to work with such a reliable and proactive supplier installing solar lighting adaptions’ to existing street lighting as well as new designs. The works are incredibly low impact for our families and cause no issues while being completed but result in much better lighting designs as well as eliminating the cost of traditional street lighting electricity bills for our client.
Christopher Irons