Case Study

Rexel

Hinkley Point A Power Station Decommissioning

Background

Magnox is responsible for decommissioning 12 nuclear power sites across the UK, including Hinkley Point A – a former Magnox nuclear power station. The supply of mains power in some areas is a major issue, and Magnox needed a solution to reduce hazards across the site and ensure that activities are carried out with due regard for the environment and health and safety.

Challenge

Hinkley Point A was a challenging environment owing to the absence of lighting for pedestrians and vehicles and digging trenches for cables caused major issues for Magnox owing to the sensitivity of the site. They needed a flexible, sustainable lighting solution to improve safety while reducing carbon emissions. They also needed to be able to move lighting across the site as the decommissioning process required. We worked closely with Rexel, our wholesale partner, to understand the complexities and came up with a solution that benefited both parties.

Pro Temp Construction [Night]

The Solution

Prolectric worked with Rexel to quickly deploy 15 ProTemp solar lighting units at the site. The ProTemp is a temporary solar lighting column that delivers a powerful and reliable year-round lighting solution without noise, emissions or the need for mains power. The unit is mounted on a 1-tonne concrete base with a 5m column and can easily be moved with a forklift, dispensing with the need to dig trenches, reducing installation costs and red tape. The deployment helped Magnox achieve significant reduction in CO2 emissions, saving time and money.

The Result

Our long-standing relationship with both Rexel and Magnox meant that we were able to deliver and install the 15 ProTemp units onto the site within just two months of the initial order. By deploying sustainable lighting at Hinkley Point A, Magnox has achieved a major reduction in CO2 emissions, helping them towards their net-zero targets. They have also saved significant time and money – ProTemp is a fully off-grid lighting solution, with no cables and no trenching required, combining effortless installation and zero maintenance with easy sitewide portability.

Downloads

Download the Case Study to assist in your business case.

What our clients
have to say

We’re excited to work together
on your next project.

Available for purchase or hire
Prolectric Lights Off ProTemp

Prolectric are fully accredited with the following bodies