Severn Tunnel Electrification

Background

The Severn Tunnel is a 134 year old tunnel, which is a four-mile-long connection between South Gloucestershire and Monmouthshire in South Wales.

An innovative electrification system, for the railway track through the Severn Tunnel, is being installed by the ABC Electrification joint venture that includes Costain, Alstom and Babcock.

The tunnel required electrification as part of the great western main line modernisation strategy to help reduced journey times between south Wales and London by as much as 15 minutes and provide an additional 15,000 weekday seats.

Network Rail Logo

Challenge

The project was a fast-track, 6-week project in which the site needed to be active for 24 hours, 7 days a week to ensure it was completed on-schedule, otherwise it would cause significant disruption to rail users. As the project was taking place in Autumn, site lighting was needed for 12 hours due to the longer nights. Moreover, as the lights were needed to run for 12 hours a day, 7 days a week, for the full 6 weeks, the carbon and financial cost would have been significant.

Severn Tunnel Electrification - ProLight onsite

The Solution

ABC Electrification required 12 hours per night constant operation for the duration of the works. The requirement was for automatic switch on at dusk and automatic switch off at dawn. This requirement is simply accommodated within the ProLight Solar Tower Light, and can be achieved either through setup to automatically trigger via our Smart Remote Portal, manual programme adjustment onsite or remote control via our Smart Remote Portal.

Background Motif Decoration
Background Motif Decoration

The Result

The units operated successfully for the duration of their time on site with no human intervention, no maintenance and zero noise, which was required as it was in close proximity to the site cabins. Most crucially the lights required no diesel or refuelling and emitted zero carbon emissions.

Downloads

Download the Case Study to assist in your business case.

What our clients
have to say

We’re excited to work together
on your next project.

Available for purchase or hire
Prolight Lights off

Prolectric are fully accredited with the following bodies