We collaborated with Traction Rail to implement sustainable and efficient lighting solutions for various railway projects.
The partnership aimed to address the unique challenges posed by rail environments while meeting the stringent safety requirements set by Network Rail.
The unique requirements of each phase, such as the trackside and car park installations, demanded a tailored solution that could address diverse needs. The new lighting solution needed to be easy to deploy, cost-effective to run, and provide reliable year round lighting.
Ensuring the installation works had minimal environmental impact. The solution also needed to be environmentally sustainable and significantly reduce carbon emissions. Meeting Network Rail’s standards and specifications for the proposed lighting solutions.
Prolectric and Traction Rail implemented a multi-faceted approach to address the challenges.
Download the Case Study to assist in your business case.
QinetiQ has a target of becoming a Net-Zero company with ambitious near-term GHG emission reduction targets. To assist with this ambition, Prolectric assessed our lighting needs, developed a detailed site lighting plan and installed over 129 solar street lights and bollards at our Headquarters at Cody Technology Park. The new lights are bright and reliable, improving health and safety during the hours of darkness. The lighting is high quality and proving to be robust in harsh weathers. All lighting completed so far, has required minimal maintenance and the installation has been well received by both the company and our tenants alike.
Simon HomerI was familiar with the off-grid benefits of Prolectric solar lighting from previous trials, so I knew that using the ProTemps at Euston would mean we would get reliable site illumination without having to connect to mains electricity, therefore achieving a welcome saving in utility charges. As the substation site is next to a residential estate, it was also important that we make all reasonable efforts to reduce our impacts, such as noise from generators. My role at Skanska is to encourage environmental improvement and promote the use of equipment powered by renewable sources. It is important for contractors to be aware of solar-powered alternative for temporary lighting where it can reduce any adverse environmental impacts, and it will also help to save on project costs.
Richard CattanHaving used Prolectric for several lighting projects now, I find their approach, ease of use, knowledge and range of products to be very good. It’s fantastic to be able to work with such a reliable and proactive supplier installing solar lighting adaptions’ to existing street lighting as well as new designs. The works are incredibly low impact for our families and cause no issues while being completed but result in much better lighting designs as well as eliminating the cost of traditional street lighting electricity bills for our client.
Christopher Irons