The Solution
The UWE contractors car park was contracted through Speedy Services at the time and Senior Electrical Engineer, Martin Kemp, commented ‘We were first made aware of the technology by Speedy Services, which was when the lighting difficulties were faced for the car park.
After researching the product more, we decided to install 20x ProTemp Temporary Solar Street Lights/Lighting Columns onsite. The deployment took less than an hour. The ProTemps produced an excellent level of light and I am pleased with their performance through the harsh winter months’.
Martin added, ‘As well as the savings from zero running costs, it has been fantastic to use a renewable lighting product. It would have taken 4 to 6 weeks to get power to site at a great expense. The ground can be returned to grassland with extreme ease’.